logo

All Exams

Notifications

All Exams

Explore All Exams at KGS

All Exams
Home>Current Affairs>ALMM Framework Extended to Solar Ingots and Wafers
Current Affairs made simple.

Current Affairs provides you with the best compilation of the Daily Current Affairs taking place across the globe: National, International, Sports, Science and Technology, Banking, Economy, Agreement, Appointments, Ranks, and Report and General Studies

banner-image

ALMM Framework Extended to Solar Ingots and Wafers

SYLLBUS

GS-2: Government Policies and Interventions for Development in various sectors and Issues arising out of their Design and Implementation.
GS-3: Infrastructure: Energy; Conservation, environmental pollution and degradation.  

Context: Recently, the Ministry of New and Renewable Energy expanded the Approved List of Models and Manufacturers (ALMM) framework by introducing ALMM List-III for solar ingots and wafers.

More on the News

  • The new provisions will come into effect from 1 June 2028 and extend mandatory domestic sourcing across the solar value chain.
  • The amendment builds upon the ALMM Order, 2019, which ensures quality and reliability in solar manufacturing.
  • The decision aims to promote domestic production and reduce dependence on imports.
  • The ALMM LIST-I consists of specifying models and manufacturers of Solar PV Modules, and LIST-II specifies models and manufacturers of Solar PV Cells.

Key Provisions of the Expansion

  • The government has fixed 1 June 2028 as the effective date from which all applicable solar projects must use ALMM-listed wafers.
    • Wafers (List-III):
      • Wafers are intermediate components used in the manufacturing of solar cells.
      • Projects commissioned after the effective date must source wafers from approved domestic manufacturers.
    • Ingots (Upstream Integration):
      • Ingots are the raw crystalline material used to produce wafers.
      • Manufacturers must have equivalent ingot manufacturing capacity to be eligible for ALMM List-III for wafers.
  • ALMM List-III will be issued only when at least three independent manufacturers with a combined capacity of 15 GW are available.
  • The policy applies to projects under net metering, open access and those awarded under the Electricity Act, 2003.
  • Projects bidding after the notified cut-off date must mandatorily use ALMM-listed wafers.
  • After the effective date, ALMM List-I modules must use ALMM-listed cells and wafers, ensuring complete value chain compliance.
  • The amendment does not dilute existing Domestic Content Requirement (DCR) provisions under the existing MNRE schemes.
  • The policy includes grandfathering provisions to protect ongoing projects.

Exemptions and Transitional Provisions

  • Projects with bids submitted on or before the cut-off date are exempt from using ALMM-listed wafers.
  • Projects with pre-signed PPAs or bids before the cut-off date will continue to enjoy this exemption.
  • Net metering and open access projects commissioned before 1 June 2028 are exempt from wafer requirements.
  • Government captive projects will follow phased compliance based on their commissioning timeline.
  • Thin-film solar modules manufactured in integrated units are treated as compliant with wafer and cell requirements.

Significance of the Move

  • The policy promotes domestic value addition across the solar manufacturing chain.
  • The measure reduces dependence on imported wafers and ingots.
  • The framework enhances supply chain resilience and quality assurance.
  • The policy encourages investment and generates employment in upstream manufacturing.
  • The initiative supports India’s target of achieving 500 GW of non-fossil fuel capacity by 2030.

Source: 
PIB
CDNBBSR
CDNBBSR

footer image

The most trusted learning platform on your phone

With our training programs, learning online can be a very exciting experience! Take the next step toward achieving your professional and personal objectives

app-storeplay-store
logo
Khan Global Studies Pvt. Ltd. 5th Floor,
A13A, Graphix 1 Tower B, Sector 62,
Noida, Uttar Pradesh 201309

Course Related Query:

Ask Your DoubtsStore Related Query:[email protected]

Get Free Academic Counseling & Course Details

KGS best learning platform

About Khan Global Studies

We love learning. Through our innovative solutions, we encourage ourselves, our teams, and our Students to grow. We welcome and look for diverse perspectives and opinions because they enhance our decisions. We strive to understand the big picture and how we contribute to the company’s objectives. We approach challenges with optimism and harness the power of teamwork to accomplish our goals. These aren’t just pretty words to post on the office wall. This is who we are. It’s how we work. And it’s how we approach every interaction with each other and our Students.


What Makes Us Different

Come with an open mind, hungry to learn, and you’ll experience unmatched personal and professional growth, a world of different backgrounds and perspectives, and the freedom to be you—every day. We strive to build and sustain diverse teams and foster a culture of belonging. Creating an inclusive environment where every students feels welcome, appreciated, and heard gives us something to feel (really) good about.

Copyright 2026 KhanGlobalStudies

Have a question?

Get Free academic Counseling & Course Details

floatButton