Give each revision session a real date and keep unfinished sessions on a separate list. When the calendar moves into a new week, that list shows what still needs a decision. You can reschedule a task, reduce it or finish it without rebuilding the whole timetable.

This is useful when competitive-exam preparation has to fit around classes, work or travel. A fixed timetable tells you when a class happens. A dated revision list records the work you intend to complete between those classes. Keep both, but give them different jobs.

Make a session small enough to finish

Start with the hours you actually have available after classes and other commitments. Then choose a piece of work for each session. “Revise reasoning” leaves the stopping point unclear. “Attempt ten seating-arrangement questions and check the explanations” gives you something specific to complete. Ten is an example, not a required daily target; choose a workload that fits your time.

Keep the current syllabus beside the plan so that a busy week does not quietly become a week spent only on favourite topics. Add new lessons, revision and practice as separate tasks when they need separate sessions. Watching a class and completing its exercises are different activities, even if they concern the same chapter.

In a Notion database, use the row title for the action, a Date property named Session date and a Checkbox named Done. Put the chapter reference or question-set link inside the row’s page. A Subject property can help if you are preparing several subjects, but leave extra scores, formulas and dashboards until you have a reason to use them.

Keep this week, overdue work and undated work in view

Keep the original table unfiltered, then add views of the same database. Make This week show unfinished sessions dated within the current week. Make Overdue show rows where Session date is before today and Done is unchecked. A third view, Unscheduled, should show unfinished rows with no Session date. That last view catches tasks you wrote down without deciding when to do them.

The walkthrough for a dated weekly planner in Notion explains the date-and-checkbox setup and the separate Overdue view. Apply that structure to your revision sessions. Its more elaborate week pages and calendar connections can wait; the useful starting point is a list of tasks that retains their dates.

Open the settings menu at the top of a view, then Filter. Combine the date rule and the unchecked Done rule with AND so that both must be true. Notion’s guidance on database filters explains those combinations and notes that each view has its own settings. Check each view separately rather than assuming that a rule applied to one changed them all.

An unfinished Tuesday session may appear in both This week and Overdue on Wednesday. That is expected: it belongs to the current week and its planned day has passed. It is one record shown in two views. Open the record and change it there instead of making a second copy.

Decide what a missed session needs

Suppose Tuesday’s plan was to attempt a practice set and check every explanation. You completed the questions but could not finish the review. Keep the session open, note what remains and give the review a new date. Do not mark the whole task Done merely because you started it.

If this happens repeatedly, look at the size of the task before adding more study hours. Split a long chapter into named sections, or separate the attempt from the answer review. Leave some room in the week for unfinished work; a timetable filled to every available minute has nowhere to put a delayed session.

On Monday, inspect Overdue before planning new sessions. Reschedule work that still matters, narrow an oversized task and leave a short note when a task is no longer needed. Before changing the date, add a dated note of what you attempted and which part remains unfinished. That gives the next session a clear starting point.

Check the list before trusting the display

If a session disappears, find it in the unfiltered table first. Check its date, its Done checkbox and the rules in the view where you expected it. A completed row should disappear from an unfinished-work view; an unfinished, undated row belongs in Unscheduled. Neither case means the record was deleted.

For a persistent display problem, NotionSolutions’ guides to databases and task views offer further setup and troubleshooting help. Match the instructions to the problem you found, such as a date outside the filter’s range. Copying another complete dashboard is unlikely to help you understand the existing rule.

Before filling the next week, check one completed session, one missed session and one undated task against the three views. Once those records appear where they should, schedule the next piece of revision you can realistically finish.